A two-panel hoop frame on skids, with a tarp, that covers one 5 ft round bale.

Draft plan, generated from the model. Not yet build-tested.
5 ft roundBale
84 x 100 inFootprint
78 inCrown
4 to 6 hrBuild time
$231.08Materials

Drawings All dimensions in inches

3D viewfinished
3D view
3D view, framingsiding and roof removed
3D view, framing
Front elevation
Front elevation 85 3/8 in 83 3/4 in
Right elevation
Right elevation 112 in 83 3/4 in
Plan viewfrom above
Plan view 85 3/8 in 112 in

Cut list: lumber Long-point lengths; angles noted

QtyStockLengthPartCut
32x4 PT81Tieon edge, between the skids
12x6 GC100Skid lefton edge
12x6 GC100Skid righton edge

Lumber cutting diagram Lengths chosen for the lowest cost; 1/8 in kerf, 1/2 in end trim

2x4 PT x 8 ft
Tie 1 81
2x4 PT x 8 ft
Tie 2 81
2x4 PT x 8 ft
Tie 3 81
2x6 GC x 10 ft
Skid left 1 100
2x6 GC x 10 ft
Skid right 1 100

Shopping list $231.08 checked / $0.00 estimated

ItemStoreQtyEachLineNote
2x4x8 ground-contact pressure-treatedHome Depot3$4.68$14.04see lumber cutting diagram
2x6x10 ground-contact pressure-treatedHome Depot2$12.98$25.96see lumber cutting diagram
Cattle panel, 16 ft x 50 in, 4-gaugeTractor Supply2$37.99$75.98
Poly tarp 20 x 30 ft, 10 mil (Tarpex)Tractor Supply1$62.99$62.99
UV zip ties 11 in, 100 ct (also used for tie wire)Home Depot1$17.65$17.65
Exterior wood screws #9 x 2.5 in, 5 lb boxHome Depot1$29.97$29.97
Poultry staples 3/4 in, 1 lbSouthern States1$4.49$4.49
Total before tax$231.08
Filled dot: price read from a store listing on Oct 20, 2026. Hollow dot: estimate. Prices come from the master price list, so they change when it changes.

Build steps

  1. Level a pad of gravel the size of the skids, 7 ft wide and 100 in long. Lay the two 2x6 skids 7 ft apart.
  2. Screw the 2x4 ties across the skids at each end and the middle.
  3. Stand one end of a 16 ft cattle panel on each skid, bend it in until it stands on both, and screw the feet down. Set two panels side by side and wire them together.
  4. Roll a 5 ft round bale in onto the gravel, on its flat end, with the tractor. Pull the tarp over the arch and the bale and strap it to the skids.
  5. Leave one end open for air so the bale does not sweat.