homestead.fyi / HAYTARP

Hay Tarp Shelter

A 136 x 120 in pole frame with a sloped poly tarp roof, to keep hay on pallets dry.

Draft plan, generated from the model. Not yet build-tested.
136 x 120 inFootprint
72 to 84 inHeight
about 100 balesCapacity
8 to 12 hrBuild time
$286.58Materials

Drawings All dimensions in inches

3D viewfinished
3D view
3D view, framingsiding and roof removed
3D view, framing
Front elevation
Front elevation 160 in 111 3/8 in
Right elevation
Right elevation 144 in 111 3/8 in
Plan viewfrom above
Plan view 160 in 144 in

Cut list: lumber Long-point lengths; angles noted

QtyStockLengthPartCut
12x4136Front beamon edge, outside the posts
12x4136Front beamon edge, inside the posts
12x4136Back beamon edge, outside the posts
12x4136Back beamon edge, inside the posts
72x4128 5/8Purlinends cut 5.7°; on edge across the beams
34x4 PT94Front postburied 10 in
34x4 PT94Back postburied 22 in

Lumber cutting diagram Lengths chosen for the lowest cost; 1/8 in kerf, 1/2 in end trim

2x4 x 12 ft
Front beam 1 136
2x4 x 12 ft
Front beam 2 136
2x4 x 12 ft
Back beam 1 136
2x4 x 12 ft
Back beam 2 136
2x4 x 12 ft
Purlin 1 128 5/8
2x4 x 12 ft
Purlin 2 128 5/8
2x4 x 12 ft
Purlin 3 128 5/8
2x4 x 12 ft
Purlin 4 128 5/8
2x4 x 12 ft
Purlin 5 128 5/8
2x4 x 12 ft
Purlin 6 128 5/8
2x4 x 12 ft
Purlin 7 128 5/8
4x4 PT x 8 ft
Front post 1 94
4x4 PT x 8 ft
Back post 1 94
4x4 PT x 8 ft
Front post 2 94
4x4 PT x 8 ft
Back post 2 94
4x4 PT x 8 ft
Front post 3 94
4x4 PT x 8 ft
Back post 3 94

Shopping list $286.58 checked / $0.00 estimated

ItemStoreQtyEachLineNote
2x4x12 stud, SPFHome Depot11$7.12$78.32see lumber cutting diagram
4x4x8 ground-contact pressure-treatedHome Depot6$11.28$67.68see lumber cutting diagram
Poly tarp 20 x 30 ft, 10 mil (Tarpex)Tractor Supply1$62.99$62.99
Exterior wood screws #9 x 2.5 in, 5 lb boxHome Depot2$29.97$59.94
UV zip ties 11 in, 100 ct (also used for tie wire)Home Depot1$17.65$17.65
Total before tax$286.58
Filled dot: price read from a store listing on Oct 20, 2026. Hollow dot: estimate. Prices come from the master price list, so they change when it changes.

Build steps

  1. Mark the six post positions and check square. Dig the front holes 10 in and the back holes 22 in deep, so the tops are 84 and 72 in above the ground.
  2. Set the posts plumb in gravel, tamped. Screw two 2x4s on edge to the outside and inside of each row of posts for a beam.
  3. Cut the purlins with a 5.7° plumb cut at both ends and screw them across the beams every 24 in.
  4. Lay the tarp over the purlins and wrap the edges round the beams. Screw it down through a 1x2 batten, every 12 in, so the wind does not lift it.
  5. Lay a floor of pallets and stack the hay on top, up to 6 ft.

Before you start